Satisfaction Guaranteed: Aboard tankers, it is a frequent practice of Ships Officers to take draft surveys many times a day. Since you are loading at a fast rate which sometimes exceeds 250Tons/Hrs, Draft changes considerably at every end of watch, And it is not possible to record all the six draft marks at all times.